Integrated pumping station is the main sewage treatment machinery and equipment, so in the construction of a lot of construction to ensure that the integrated pumping station can be healthy and effective application, below I will introduce you to the common problems of integrated pumping station lifting.
Under the condition of the integration of pumping stations to carry out the concrete construction, before installation must do a good job in the corresponding integration technical clarificaiton work of pumping stations, drainage facilities in the full integration of pumping station construction regions according to the specific situation of the integration of each pump station to carry out construction, consider the landform and geological environmental standards, emissions also need to consider the size, Integrated pump station to carry out the overall planning and layout of the construction, and in the case of specific construction, to take into account the construction system software consistent with the drainage equipment outside the plant, in the case of specific construction of the integrated pump station, before the installation of machinery and equipment, to scientific research the relevant mechanical equipment installation diagram, Make clear the construction and processing technology used by the electrical equipment of the integrated pump station. At the same time, the integrated pump station should create a perfect construction quality inspection procedure flow in the course of construction.
Integration of pumping stations in to carry out the construction of the case, it is important to ensure that all the negatives are all leveling, put a layer of 10 mm above to sandy gravel layer, concrete installation process can be based on specific circumstances to select aspects of the installation on the cement floor of anchor bolt, shall ensure that the integration of pumping stations to install the pump shell, first should maintain a standard of cement floor, The upper floor plan of the bottom plate is polished and polished. Integration of pumping station under the condition of the backfill, the integration of pumping stations to ensure total body installation accuracy, integration of pumping stations under this category for any of the backfill material, all need to use pebble or sand, can also choose some particles of other items in order to develop backfill, but integration pump backfilling large size not more than 13 mm to 25 mm.
Below for you to introduce the integrated prefabricated component integrated pump station transportation and lifting of the integrated pump station knowledge, looking forward to everyone is helpful. The transport level of the integrated pump station is placed and fixed on the transport base. In the whole process of logistics transportation, the lifting work is carried out in the middle of the lifting plate. Before the integrated pump station is installed and lifted vertically, the integrated pump station shall remove the lifting equipment and connecting accessories of the integrated pump station. In the packaging area, the customer has seen the lifting equipment, should ensure that the integrated pump station is not easy to fall down. It shall be ensured that the integrated pumping station is unloaded from the truck by proper lifting or loading of machinery. Appropriate lifting rope should always be applied according to the bolt lifting integrated pump station, the integrated pump station should be carefully unloaded and integrated pump station is placed on the floor. If the integrated pump station should be stored for a period of time before installation, the integrated pump station should be placed vertically, such as column type, and the strong support point. Integrated pump station and pump split delivery, integrated pump station lifting integrated pump station, do not install.
Lift the integrated pump station from the horizontal position to the vertical position with the integrated pump station lift lasso. In this section, the lifting hook on the pump block is not allowed to be used. When the integrated pump station lifts the prefabricated component vertically, the lifting hook shall bear the load evenly. It is advisable to use the integrated pump station noose or rope to maintain the integrated pump station and pump cover to prevent breakage. Before backfilling, check and determine the pipes and household appliances around the integrated pump station in the whole process of backfilling integrated pump station must be thoroughly maintained and applied to ensure that it is not easy to increase the load during the actual operation of tamping.
Integrated pump station backfill raw materials can not contain all pollution substances, should be river pebbles, stone sand, gravel soil, sand, particle specifications are not suitable for more than 13-25mm. Backfilling should be layered one by one, the relative height of each layer is not suitable for more than 30CM, the density of the backfilling soil of the integrated pump station should meet the design requirements and requirements of the integrated pump station. The backfill soil at the inlet and outlet of the pit should be rammed. When the backfill layer of the integrated pump station reaches 30CM from the top of the wall of the pump barrel joint, it is forbidden to apply tile base and other machinery and equipment.
-
2022-01-12 10:46:57Matters needing attention in construction of GLASS fiber reinforced plastic desulfurization tower project
-
2022-01-12 10:46:23Anticorrosion performance is an important factor in choosing FRP tanks
-
2022-01-12 10:45:42How to prevent fire in building FRP cover plate?
-
2022-01-12 10:45:08Technical disclosure of integrated pump station