With the central Plains of the larger glass steel pipe manufacturers septic tank production manufacturing industry base, to glass steel pipe manufacturers septic tank, concrete septic tank, microbial septic tank, household septic tank and so on. As the septic tank manufacturer of glass steel pipe manufacturers, the bottom enterprise I will talk with you about the installation steps of the septic tank of glass steel pipe manufacturers.
The glass steel pipe manufacturer measures the bottom design elevation of the glass steel pipe factory. According to the diameter of the product model and specification, it calculates the cutting groove depth 1 and the design elevation of the inlet and outlet connected with the waste water glass steel pipe factory. When estimating the design elevation, it is necessary to pre-embed the sand laying specification of 200mm at the bottom of the tank.
On the bottom of the glass steel pipe manufacturer foundation cushion to explore, according to the product model specifications of the length of glass steel pipe manufacturers can not be less than three points, glass steel pipe manufacturer depth of 1600-800mm. Glass steel pipe factory bottom compaction, sand 200mm and ground leveling, no bevel, stone and other dirt is allowed in the sand.The lifting of glass steel pipe manufacturer is in place. When lifting in place, pay attention to the inlet and outlet location of septic tank.
After the glass steel pipe manufacturer is lifted in place, the glass steel pipe manufacturer should measure the flatness. If the glass steel pipe manufacturer is uneven, it should be adjusted to make the level.
Glass steel pipe manufacturer layered backfilling soil: glass steel pipe manufacturer backfilling soil must be glass steel pipe manufacturer septic tank water injection to 1/2, to ensure that the product in the backfilling force balance and do not move. When the glass steel pipe manufacturer backfills the soil, both sides of the bottom end of the glass steel pipe manufacturer's product shall be plugged with manpower. When glass steel pipe manufacturer fills 30-50cm above, it must be compacted every 30cm. After backfilling to 1/2 of the product, water is injected into the septic tank again. The glass steel pipe manufacturer is 40-50cm away from the top of the tank, and then backfill the soil, and compaction is carried out every 30cm until it is level with the top of the product.
The backfill soil above the top of the glass steel pipe manufacturer's products must be dense. If the glass steel pipe manufacturer's products are built in the road surface area, no car is allowed to roll before the road surface is treated. Glass steel pipe manufacturer backfill when the quality of backfill soil shall be in line with the backfill construction acceptance specifications, glass steel pipe manufacturer is not allowed to use urban garbage as backfill soil application, soil Angle, stone and hard dirt must be removed, backfill, symmetrical backfill, glass steel pipe manufacturer must not part of the impact.
-
2022-01-12 10:46:57Matters needing attention in construction of GLASS fiber reinforced plastic desulfurization tower project
-
2022-01-12 10:46:23Anticorrosion performance is an important factor in choosing FRP tanks
-
2022-01-12 10:45:42How to prevent fire in building FRP cover plate?
-
2022-01-12 10:45:08Technical disclosure of integrated pump station